Second fix and MEP
Floor protection for construction companies
Screed is down, floors are laid, and now every service trade needs access. Protection has to survive weeks of continuous traffic, not days.
Recommended grade500–1000 GSM
Typical order2,000–20,000 m² per project
Protects againstHeavy traffic, wet trades
What goes wrong without it
Whole-floor replacement charged back against the main contract at practical completion.
Typical replacement cost:AED 800,000
Protection cost:AED 12,000
What to specify
Heavy grades, taped seams, and enough roll width to cover fast. Reusability matters at this volume, since the same board should serve multiple phases.
| Grade | Thickness | Duty | Suits this trade |
|---|---|---|---|
| 175 GSM | 2.0 mm | Light foot traffic | Not required |
| 250 GSM | 3.0 mm | General site traffic | Not required |
| 500 GSM | 3.5 mm | Heavy traffic, wet trades | Recommended |
| 1000 GSM+ | 5.0–10.0 mm | Plant, trolleys, live environments | Recommended |
Quote
Price it for your project
Your trade is already filled in. Add a rough area and we will come back with a grade recommendation and a price.